Monthly Archives: October 2013

Almost…

Left wall Back wall Right wall Front Advertisements

Posted in Uncategorized | Leave a comment

Patch panel setup

Patch panel location (cat6 and pl259).

Posted in Uncategorized | Leave a comment

Finishing up more trim…

About 80 percent done.

Posted in Uncategorized | Leave a comment

Antenna outside connection and OCF dipole up in the trees

Posted in Uncategorized | Leave a comment

Trim before and after..

A before and after look at the trim installation on the front wall.

Posted in Uncategorized | Leave a comment

Surrounded by beadboard

Beadboard all up .. finally.. now to put up some trim

Posted in Uncategorized | Leave a comment

Antenna Hole!

Posted in Uncategorized | Leave a comment

Backwall installed.. needs some trim and some paint fixups

Posted in Uncategorized | Leave a comment

Fancy light

Added a fancy (aka $20) light from lowes .. turned out pretty well

Posted in Uncategorized | Leave a comment

Ceiling is in

Little more work than I was expecting but came out fairly well.

Posted in Uncategorized | Leave a comment